Expert team of our design engineers and consultants with broad practical experience in designing over many years, with the use of the state-of-the-art computer equipment, their knowledge and skills are capable of meeting demands of investors concerning the designing of:
- Gas pipelines and hot water pipelines
- Thermotechnical and thermal energy installations and plants
- Electrotechnical installations, remote control systems
- Technological processes and plants (storing, process plants, metal surface protection)
Our company also offers architectural designing of residential, public and industrial buildings for the purpose of faster solving a designing task related to the above mentioned projects.
We create all phases of the project documentation necessary for issuing a construction licence and permit.
Projects in year 2012.
- MAIN MACHINE-TECHNOLOGICAL PROJECT OF GAS STATION FOR OXYGEN - FISH FARM BOLJEVAC
- MAIN PROJECT OF VENTILATION SYSTEM HOODS SANATION - FISH RESAURANT RIBNJAK PIK BEČEJ
- MAIN PROJECT OF VENTILATION IN MOLASSES BOILER ROOM -SOJAPROTEIN AD BEČEJ
- MAIN MACHINE-TECHNOLOGICAL PROJECT OF GAS STATION FOR NITROGEN-FIAT AUTOMOBILI SRBIJA KRAGUJEVAC
- MAIN PROJECT OF CONNECTING GAS PIPELINE AND MRS – BUSINESS AND PRODUCTION COMPLEX -QUIVOGNE RS BEČEJ
- MAIN PROJECT OF CONNECTING GAS PIPELINE , MRS AND INTERNAL GAS INSTALLATION – WORKING COMPLEX -MK COMMERCE ADA
- MAIN MACHINE PROJECT OF CENTRAL HEATING IN THE MAIN BUILDING QUIVOGNE RS BEČEJ
- MAIN MACHINE PROJECT OF CONDENSATE SANATION IN SUBSTATION – DETERGENT FACTORY HENKEL SRBIJA KRUŠEVAC
- MAJOR PROJECT OF HEATING INSTALLATION IN MANUFACTURING FACTORY AND PACKAGING WITH STORAGE SPACE -CAGELESS STRIPES HENKEL SRBIJA KRUŠEVAC
- MAJOR PROJECT OF SUBSTATION WITH STEAMLINE IN LIQUID DETERGENT FACTORY HENKEL SRBIJA KRUŠEVAC
- MAJOR RECONTRUCTION PROJECT OF GAS LINE,TILE FACTORY 2 - NEXE GROUP – BUILDING MATERIALS FACTORY NOVI BEČEJ
Projects in year 2013.
- MAJOR PROJECT OF BOILER ROOM HEATING SYSTEM- NEOPLANTA MEAT INDUSTRY NOVI SAD
- MAJOR PROJECT OF GAS BOILER ROOM IN QUIVOGNE RS BEČEJ
- MAJOR MECHANICAL PROJECT OF INTERNAL GAS INSTALLATION IN QUIVOGNE RS BEČEJ
- MAJOR PROJECT OF BOILER ROOM IN NEOPLANTA AD MEAT INDUSTRY NOVI SAD
- PROJECTS OF DOMESTIC GAS INSTALLATIONS
Projects in year 2014.
- MAIN PROJECT OF REPLACING M&E EQUIPMENT IN EXISTING BOILER ROOM IN TIGAR TYRES, PIROT
- MAIN PROJECT OF PIPE BRIDGE EXTERNAL DISTRIBUTION OF FLUIDS FOR CONNECTION NEW PRODUCTION FACILITY IN BIG TIGAR IN TIGAR TYRES, PIROT
- MAIN PROJECT OF RECUPERATION TECHNOLOGICAL STEAM FOR AUTOCLAVES - XELLA SRBIJA VREOCI
Projects in year 2015.
- MAIN PROJECT OF GENERATOR AND STEAM INSTALATION REQUIRED FOR PRODUCTION - GRAND-EKSPORT SKOPJE, MACEDONIA
- MAIN MECHANICAL TECHNOLOGICAL PROJECT OF FERMENTATION CHAMBER FOR PRODUCTION IN GRAND-EKSPORT SKOPJE, MACEDONIA
Projects in year 2016.
- MAIN PROJECT FOR INVESTMENT MAINTENANCE OF STEAM DISTRIBUTION TO CHAMBERS XELLA BIH TUZLA
- MAIN PROJECT OF THE NEW BOILER ROOM CAPACITY 2 X 10 T/H OF STEAM HEMOFARM AD VRŠAC
Projects in year 2017.
- MAIN PROJECT OF FEED WATER TANK OF STEAM BOILER IN HENKEL SRBIJA DOO, KRUŠEVAC
- HOT WATER BOILER ROOM 4500kW – 1X3MW AND 1X1,5 MW FRONERI ADRIATIC S STARA PAZOVA
Projects in year 2018.
- MAIN PROJECT OF MACHINE AND ELECTRO INSTALLATION IN BOILER ROOM IN SOKO ŠTARK BELGRADE
- MAIN PROJECT OF MACHINE AND ELECTRO INSTALLATION IN BOILER ROOM IN ARETOL, NOVI SAD
- RECONSTRUCTION PROJECT OF THE NESTEA AND DANUBE PLANT IN NESTLE ADRIATIC WITH SURČIN
- THE BOILER PLANT EXTENSION PROJECT RAUCH SRBIJA DOO KOCELJEVA
Projects in year 2019.
- MAIN PROJECT AND TECHNICAL DOCUMENTATION OF HEATING, HEATING PIPELINE AND SUBSTATION FROM HEAT RECOVERY, SILVER AND GOLD MINE LECE
- ALL PHASES OF THE STEAM PIPELINE AND CONDENSATE INSTALLATION PROJECT IN NESTLE ADRIATIC S SURČIN
Projects in year 2020.
- MAIN PROJECT OF WATER VAPOR PIPELINES FOR POWER SUPPLY OF A NEW FACILITY FOR THE PRODUCTION OF DETERGENTS WITH A CAPACITY OF 1500 KG/H AND RETURN CONDENSATE PIPELINES FROM THE SAME FACILITY, HENKEL SERBIA KRUŠEVAC
- MAIN PROJECT OF MECHANICAL AND ELECTRICAL INSTALLATIONS OF THE HOT WATER BOILER ROOM BARRY CALLEBAUT SOUTH EAST EUROPE, BELGRADE
- MAIN PROJECT OF COOLING STATION AND BOILER ROOM ADAPTION HEMOFARM, DOO, BANJA LUKA
Projects in year 2021.
- MAIN PROJECT OF MACHINE AND ELECTRO INSTALLATION OF NESTLE ADRIATIC SURČIN HOT OIL BOILER ROOM 3 MW CAPACITY
- MAIN PROJECT OF MACHINE AND ELECTRO INSTALLATION OF STEAM BOILER ROOM DEM KULPIN, 2 x 2 t / h CAPACITY + 800 kW HOT WATER BOILER
- MAIN PROJECT OF MACHINE AND ELECTRO INSTALLATION IN BOILER ROOM MIN KOMERCE BELGRADE, 2t/h CAPACITY
Projects in year 2022.
- MECHANICAL AND ELECTRICAL PROJECT OF RECONSTRUCTION OF CONDENSATE RETURN INSTALLATION FRIKOM DOO BELGRADE
- DESIGN OF INTERNAL STEAM AND CONDENSATE DISTRIBUTION FOR THE FACILITY SIMPLY COOK NESTLE ADRIATIC S SURČIN
Projects in year 2023.
- DEMOLITION PROJECT, ARCHITECTURAL AND CONSTRUCTION PROJECT, MECHANICAL PROJECT, ELECTRICAL ENERGY PROJECT AND FIRE PROTECTION PROJECT ELIXIR PRAHOVO DOO PRAHOVO
- MECHANICAL AND ELECTRICAL PROJECT OF RECONSTRUCTION OF CONDENSATE RETURN INSTALLATION HEINEKEN SERBIA DOO ZAEČAR
Projects in year 2024.
- ELABORATION OF THE EXISTING THERMO-MECHANICAL INSTALLATIONS AND GAS BOILER PLANT EQUIPMENT IN THE FORM OF P&I DIAGRAMS AND BASIS