1. Manufacturing the gas installations in TILE FACTORY AD POLET IGK Novi Becej, year 2002
  2. Manufacturing 500m internal gas installation in factory for fruit and vegetables processing RJ FLORA, PIK BECEJ Becej, year 2002
  3. Manufacturing the steam substation and steam line, RJ FLORA, PIK BECEJ Becej, year 2003
  4. Manufacturing the steam line at the facility in the old Rubber factory for producing rubber AD GALAXY Ruma, year 2004
  5. Manufacturing the ammonia pipeline with additional reinforcement and connection to the refrigeration plant for fruit and vegetables RJ FLORA, PIK BECEJ Becej, 2004
  6. Manufacturing connections for new presses at the facility for production of tires AD GALAXY Ruma, year 2004
  7. Manufacturing connections for presses in the factory for the production of rubber AD GALAXY Ruma, year 2005
  8. Manufacturing the water process installation, steam and air in the plant "warehouse" and "bridge" at the factory for processing of fruits and vegetables doo PRIMAPRODUKT Subotica i Kikinda , year 2007
  9. Manufacturing the primary water line for heat exchanger and distillates connection West Pharmaceutical Services in Belgrade and Kovin, year 2007
  10. Manufacturing the reduction stations in Carlsberg Brewery Celarevo, year 2008
  11. Manufacturing internal distribution of steam with reducing stations in a dairy IMLEK AD Beograd, year 2009
  12. Manufacturing a steam line with reducing station for power supply of tomato processing line in fruit processing factory NECTAR Backa Palanka, year 2010
  13. Manufacturing instalation plant for Ar/CO2 FIAT CARS SERBIA, Kragujevac year 2012
  14. Manufacturing pipelines for Ar/CO2, O2 and N2 welding robots supply in a factory for producing automotive parts PMC AUTOMOTIVE Kragujevac, year 2012
  15. Manufacturing pipeline for water pressure in the water treatment plant at the factory for processing soybean AD SOJAPROTEIN Becej, year 2012
  16. Manufacturing the main steam lines, steam substation and steam in propulsion on home chemistry HENKEL Krusevac SERBIA, year 2012
  17. Dislocation lines for peanut processing and production of nitrogen installation, compressed air and water in the factory MARBO PRODUCT Backi Maglic, year 2012
  18. Manufacturing and constructing the liquid oxygen installation for the pond AIR LIQUIDE DOO SERBIA Boljevac, year 2012
  19. Manufacturing steam installations, steam substations and condensate return installation for green cheese production facilities at the plant for milk processing MLEKOPRODUKT Zrenjanin, year 2012
  20. Manufacturing the installation of condensate return in home chemistry HENKEL Krusevac SERBIA, year 2012
  21. Manufacturing the installation of condensate return in ALWAG DOO Novi Sad, recycling plant in Gajdobra, year 2013
  22. Recuperation technological steam at the autoclave plant in the production plant XELLA SERBIA DOO Vreoci, year 2015
  23. Production of fermentation chamber, GRAND EXPORT DOOEL, Skopje Macedonia, year 2015
  24. Production of LPG plant, GRAND EXPORT DOOEL, Skopje Macedonia, year 2015
  25. Recuperation technological steam at the autoclave plant in the production plant XELLA BIH DOO Tuzla, year 2016
  26. Disassembly of Sweet dehydrated Culinary - mixing area, packing area and 12 m sylo in NESTLE Linz, Austria, year 2017
  27. Assembly of Sweet dehydrated Culinary - mixing area, packing area and 12 m sylo in NESTLE ADRIATIC S, Surčin, year 2017
  28. Disassembly of Liquid sauces - mixing area, packing area and sylo in NESTLE Linz, Austria, year 2018
  29. Installation of the NESTEA line in NESTLE ADRIATIC S, Belagrade, year 2018
  30. Assembling equipment for mixers packers ans sylos of liquid products, NESTLE ADRIATIC S, Belagrade year 2017
  31. Dismantling of Cipiripi line in Nestle Adriatic S Surčin, year 2018
  32. Installation of the Cipiripi line in NESTLE ADRIATIC S, Belagrade, year 2018
  33. Installation for water heating for chamber heating in IM GORANOVIĆ, Montenegro Nikšić, year 2018
  34. Installation of boiler, superheater, pipelines and steam valves in NIS AD, Novi Sad, year 2018
  35. Installation of propane, comressed air, helium, hydrogen and oxygen in MODINE SRB, Sremska Mitrovica, year 2018
  36. Hot water pipeline for technology – phase II in FRONERI ADRIATIC, Stara Pazova, year 2018
  37. Hot and cold water pipeline WEST PHARMACEUTICAL SERVICES DOO Belgrade, facility Kovin, year 2019
  38. Connecting all installation to the new dairy IMLEK AD Padinska Skela, year 2019
  39. Installation of evaporating station PEPSI, Dobanovci, year 2020
  40. Pipeline installation of liquid carbon dioxide, cooling center GOMEX, Zrenjanin, year 2020
  41. Pipeline supports UHT, IMLEK AD, Padinska Skela, year 2020
  42. Production of steel structure of pipeline supports near the building KMN, IMLEK AD, Padinska Skela, year 2020
  43. Instalation of tube heat exchanger E-172 SOJAPROTERIN DOO, Bečej year 2020.
  44. Connecting installations in the reception and pasteurization plant IMLEK AD Padinska Skela year 2020
  45. Mechanical installations - compressed air JT INTERNATIONAL Senta, year 2020
  46. Mechanical installation - compresed air in IGM MLADOST Leskovac, year  2021
  47. Reconstruction of tobacco pneumotransport installation with filter installation JT INTERNATIONAL, Senta, year 2021
  48. Mechanical installation for high preassure hot water in BARRY CALLEBAUT SOUTH EAST EUROPE DOO Novi Sad, year 2021
  49. Connecting calorifer in IMLEK AD, Padinska Skela, year  2021
  50. Repair of energy installations for "Tri Blender" in IMLEK AD, Padinska Skela, year 2021
  51. Connecting a steam exchanger for office heating of KMN in IMLEK AD, Padinska Skela, year 2021
  52. Installation of steam release valve from boilers in BABY FOOD FACTORY, Dobanovci, year 2021
  53. Delivery and replacement of steam heater of sanitary water in boiler room in HUTCHINSON DOO, Ruma, year 2021